Pre-mixed mortar is sold by the bag, and each bag is rated for a set number of bricks or blocks. That rating comes from the maker's data sheet and leaves out waste. The calculator adds the waste you set and rounds up to whole bags. Treat the result as an estimate, since yields vary by product and by joint thickness.
How to use this calculator
- Pick the laying: modular brick or standard concrete block. A block covers far more wall than a brick, so the bag counts differ a lot.
- Measure the wall's length and its height from the base to the top course, in feet. For a sloped top, such as a gable, use an average height.
- Open More options and enter the area of every door and window, in square feet. Leave it at zero for a solid wall.
- Keep the extra for waste at 15 percent, the low end of the brick industry's range. Raise it for thick beds or full-bed block work, which use more mortar.
- Check the bag's data sheet. If its yield differs from the one used here, add the waste to the units, divide by that yield and round up. Buy all the bags before the first course goes down.
Worked examples
Brick garden wall
Laying: Modular brick · Wall: 24 × 3 ft
- Mortar mix
- 16 80 lb bags
- Bricks in the wall
- 486 bricks
- Laid per bag
- 35 bricks
- Wall area
- 72 sq ft
Block shed wall with a door
Laying: 8x8x16 block · Wall: 12 × 8 ft · Openings to subtract: 21 sq ft
- Mortar mix
- 9 80 lb bags
- Blocks in the wall
- 85 blocks
- Laid per bag
- 12 blocks
- Wall area
- 75 sq ft
Brick wall with a door and window
Laying: Modular brick · Wall: 20 × 8 ft · Openings to subtract: 36 sq ft
- Mortar mix
- 28 80 lb bags
- Bricks in the wall
- 837 bricks
- Laid per bag
- 35 bricks
- Wall area
- 124 sq ft
Low block planter wall
Laying: 8x8x16 block · Wall: 16 × 2 ft
- Mortar mix
- 4 80 lb bags
- Blocks in the wall
- 36 blocks
- Laid per bag
- 12 blocks
- Wall area
- 32 sq ft
Mortar bags for common wall sizes, brick and block
| Wall | Laying: Modular brick | Laying: 8x8x16 block |
|---|---|---|
| 10 × 4 ft | 9 | 5 |
| 20 × 4 ft | 18 | 9 |
| 20 × 8 ft | 36 | 18 |
| 40 × 8 ft | 71 | 35 |
Each cell: Mortar mix (80 lb bags). Inputs not in the table use the calculator's starting values.
How the bag count is worked out
The calculator takes the wall area, which is length times height minus any openings. For brick, it multiplies that area by 6.75 bricks per square foot to get the bricks in the wall. For block, it divides the area by the face one block covers, 0.889 sq ft, which includes its joint. It then adds the waste to the unit count and divides by the number one bag lays. Makers' data sheets give 35 to 37 bricks standard bricks or 12 to 13 blocks concrete blocks per bag. The calculator uses the lower figure in each range, so it errs toward more bags.
The extra covers mortar that is mixed but not placed, and mortar lost on the way to the wall. The calculator counts bags rather than cubic feet, because pre-mixed mortar is sold by the bag and makers rate each bag by the units it lays.
Type N, Type S and mixing your own
The types you will see most often are Type N and Type S. Type N is the general-purpose mortar for most walls above ground. Type S is stronger and suits structural walls, including walls that carry loads or hold back soil. Check the wall designer's plans or local code for the type the job needs.
If you mix your own from masonry cement and sand, follow the mix proportions printed on the bag. The bag count here is for pre-mixed mortar, so it does not tell you how much sand to buy.
Bricks, blocks and what the count leaves out
The brick and block counts here are the units in the wall, without breakage, so the number to buy is higher. Work out the purchase with the brick calculator or the block calculator, and use this page for the mortar.
A block covers far more wall than a brick, so a block wall takes fewer bags for the same area.
Mistakes to avoid
- Setting the waste to zero. The yields leave out waste, so a zero allowance can leave you short.
- Treating a thick bed like a standard one. Thicker joints and full-bed block work use more mortar.
- Leaving openings in the count. A large door or window adds units you will never lay.
- Mixing more mortar than you can place. Pre-mixed mortar stiffens once water is added, so mix only what you can lay within the working time on the bag.
How much mortar do I need by volume?
If you mix your own, work in cubic feet. A block wall takes about 8.5 cubic feet of mortar for every hundred square feet of wall, waste included. A brick wall takes about 8.1 cubic feet for every thousand modular bricks, before waste, so add 15 percent or more on top.
Common questions
How do I calculate how much mortar I need?
Find the wall area, subtract the doors and windows, and convert the rest into bricks or blocks. Add the waste, divide by the number one bag lays, and round up. The calculator does these steps when you enter the wall's size.
How many square feet does a bag of mortar cover?
Makers rate bags by units, not by square feet. Enter the wall and the calculator converts its area into units, then into bags, so the answer depends on whether you lay brick or block.
Do I need more mortar for thicker joints?
Yes. Thicker joints and full-bed block work take more mortar than the standard figures assume. Raise the waste allowance above 15 percent for those jobs.
Is this calculator for tile mortar?
No. It covers brick and concrete block walls. Tile setting mortar is a different product with its own coverage, so count tiles with the tile calculator and check the setting mortar's label.
How many bags of mortar do I need for a hundred blocks?
Divide your block count by how many blocks one full-size bag lays, which is 12 to 13 blocks. Add at least 15 percent for waste, then round up to whole bags. Using the low end of the range is the safe choice.
How many square feet does a bag of mortar cover?
Mortar mix comes in several bag sizes, and what a bag lays scales with its weight. A mid-size bag from one maker lays about 9 blocks or 26 bricks. For wall area, multiply the blocks by 0.889 sq ft, or divide the bricks by 6.75 bricks per square foot.
How much sand and cement do I need for mortar?
For masonry-cement mortar (Type N or S), mix one part masonry cement with 2.25 to 3 parts sand of damp sand by volume. One 70 lb bag of cement plus 240 lb of sand makes about 2.75 cubic feet of mortar.